Bruno SRE-2010 Manual del operador Pagina 12

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 11
©2008,2007 Bruno Independent Living Aids, Inc.® SRE-2010 Operator 03-20-2008
12
OPERATION
Optional Mid-Park Position
The mid-park is available as an option. This
feature will let you park and charge the unit
at a position between the two ends of the rail.
This allows for more room at the top and
bottom of the stairs.
1. Push either the seat rocker switch or the
remote call/send to move the stairway
elevator up or down the rail.
NOTE: The seat will always stop and beep
once when it reaches the mid-park
position.
2. To resume travel to the end of the rail (top
or bottom), release the switch (or remote
button).
3. Press again and hold until the unit arrives
at the top or bottom of the rail.
NOTE: The seat will again stop and beep once
to indicate end of travel.
Vista de pagina 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 23 24

Comentarios a estos manuales

Sin comentarios